1.Matching Parameter: Two tanks, each tank 100L without insulating layer, one is caustic tank, the other one is hot water tank;
2.Heating Way: steam coil / Electrical heater in Caustic Tank And Hot Water Tank,
3.Control system: PLC200 controller and Schneider components,
4.Steam sterilize: yes,
5.Working procedure: (2 water tanks)
6.Press→air blowing/drain off→rinse water washing→air blowing/drain off→hot caustic washing→air blowing/to caustic box→rinse water washing→air blowing/drain off→hot water 1 washing→air blowing/drain off→hot water 2 washing →air blowing/ drain off→steam sterilized (drain off) →steam keep pressure sterilized →CO2 blowing/drain off→CO2 pressure filling
1.Beer working pressure:0.10-0.15 MPa,
2.Filling Part With Flowmeter Or Not: No,
3.Air Regulator: 0.55-0.65 MPa,
4.CO2 Regulator: 0.15-0.2 MPa,
5.Beer Source Pressure: 0.15-0.20 MPa,
6.Filling Capacity: 200-500 pcs/h,
7.Can Type: 330ml ,500 ml,
8.Voltage: 3PH 380V 50 or customize,
9.Control: Siemens plc,
1.Beer working pressure: 0.10-0.15 MPa,
2.Filling Part With Flowmeter Or Not: No,
3.Air Regulator: 0.55-0.65 MPa,
4.CO2 Regulator: 0.15-0.2 MPa,
5.Beer Source Pressure: 0.15-0.20 MPa,
6.Filling Capacity: 100-500 pcs/h,
7.Bottle Type: 330ml ,500ml,
8.Control: Siemens plc,
9.Voltage: 1PH 110-240V 50/60Hz,
LD BREWERY EQUIPMENT
Feel freel to tell us all your ideas, Such as production capacity, room area, beer taste, budget, etc, Craft beer Brewery will be customized accordignly.
REQUEST A QUOTE
Will reply within an hour. (Your personal information is only used to receive quotations and will never be provided or disclosed to third parties)
YOU MAY ALSO LIKE
Please give us a message